Pre-application

Document library

On this page you can find all the materials we have produced for previous consultations on Grimsby to Walpole, including the information published as part of our Stage 1 consultation in Spring 2024 and our Stage 2 consultation in Summer 2025.

In this section, you can view the documents published as part of our Stage 1 and Stage 2 consultations. 

Our Stage 2 consultation document outlines our proposals and early environmental studies. More detailed information, including preliminary environmental information, can be found using the menu at the side of the page.

    Programme document

     

     

    2024 Stage 1 consultation documents

     

    DocumentDescription
    Project Background DocumentProviding a summary of our proposals and information on how to get involved.
    Consultation newsletterSummarising details of the Project and public consultation. 
    Stage one feedback formTo gather comments and feedback from the public consultation.
    Consultation event bannersBanners used during public information events presented during the first stage of public consultation
    Consultation StrategySetting out the approach to the first stage of consultation.
    Strategic Options ReportExplaining the strategic options considered to deliver the necessary network upgrade.
    Addendum to Strategic Options ReportExplaining the work undertaken to consider the increased demand for connections to the network since the May 2023 Strategic Options Report.
    New Walpole Substation Location Options ReportExplaining the options considered for where the new Walpole substation could be located.
    Corridor Preliminary Routeing and Siting Study (CPRSS)Providing more technical information on the project and the need for the project, the options considered, the routeing and siting options assessed and our preferred options.
    CPRSS Appendix AAppendix A to the Corridor Preliminary Routeing and Siting Study
    CPRSS Appendix BAppendix B to the Corridor Preliminary Routeing and Substation Report
    Winter 2024 Community update newsletterNewsletter providing a community update following the 2024 non-statutory consultation

    2024 Stage 1 consultation constraints plans

     

    Grimsby to Walpole - Emerging preferred corridor - Grouped constraints plans - Key plan
    Grimsby to Walpole - Emerging preferred corridor - Grouped constraints plans - Sections 1-3
    Grimsby to Walpole - Emerging preferred corridor - Grouped constraints plans - Sections 4-6
    Grimsby to Walpole - Emerging preferred corridor - Grouped constraints plans - Sections 7-9
    Grimsby to Walpole - Emerging preferred corridor - Grouped constraints plans - Sections 10-11
    Grimsby to Walpole - Emerging preferred corridor - Individual constraints plans - Key plan
    Grimsby to Walpole - Emerging preferred corridor - Individual constraints plans - Section 1
    Grimsby to Walpole - Emerging preferred corridor - Individual constraints plans - Section 2
    Grimsby to Walpole - Emerging preferred corridor - Individual constraints plans - Section 3
    Grimsby to Walpole - Emerging preferred corridor - Individual constraints plans - Section 4
    Grimsby to Walpole - Emerging preferred corridor - Individual constraints plans - Section 5
    Grimsby to Walpole - Emerging preferred corridor - Individual constraints plans - Section 6
    Grimsby to Walpole - Emerging preferred corridor - Individual constraints plans - Section 7
    Grimsby to Walpole - Emerging preferred corridor - Individual constraints plans - Section 8
    Grimsby to Walpole - Emerging preferred corridor - Individual constraints plans - Section 9
    Grimsby to Walpole - Emerging preferred corridor - Individual constraints plans - Section 10
    Grimsby to Walpole - Emerging preferred corridor - Individual constraints plans - Section 11