Document library

On this page you can find all the materials we have produced for Weston Marsh to East Leicestershire, including our Stage 1 consultation materials and webinar recordings. 

We are committed to making project information accessible to all users. If you need any information or documents in an alternative format, or if you would like a paper copy of any of our consultation or technical documents, please get in touch at [email protected] or calling 0800 138 9191

Please note there may be a charge for printed copies of technical documents. 

You may notice some changes to the way our consultation materials look and are presented. These updates reflect changes introduced through the Government's Planning and Infrastructure Act 2025, which aims to create a more streamlined and proportionate approach to consultation for major infrastructure projects. Although some consultation requirements have changed, we remain committed to engaging with local communities and stakeholders, sharing information in clear and accessible ways, and carefully considering all feedback received. For more information, please see our Stage 2 Consultation Strategy.

Interactive Map

You can use our interactive map to enter your postcode and explore the proposals near you, including our more detailed route and indicative pylon locations. 

View our interactive map

      Stage 2 Consultation Document

      This document provides an overview of the project, details our proposals and how the project has developed following the Stage 1 Consultation. It also explains how we are consulting and includes a short summary of environmental information. 

      In Your Area leaflets

      Targeted leaflets focused on specific locations along the proposed new overhead line route, including areas near the proposed new substations. They include information on the proposals in the area, maps, a summary of relevant environmental information, and how the proposals have developed since Stage 1 Consultation. 

      Feedback Form

      Share your views on our proposals. You can print a copy of the feedback form and send it to the team at FREEPOST WM TO EL (no stamp or further details needed). You can also pick a copy up at one of our consultation events listed on the 'Have Your Say' page. 

       

      If you’d prefer not to print a form, or can’t attend an event, you are also very welcome to send us an email via [email protected], send us a letter or your notes to FREEPOST WM TO EL or give us a call on 0800 138 9191.

       

      We are trying to make it as easy as possible to share feedback, so if there’s anything we can do to help you, please let us know.  

      Strategic Options Report update (SOR)

      This technical document explains the need for the project and the options being considered to meet that need. It is an update on the Strategic Options Report shared during our Stage 1 Consultation in 2025 and reflects how the project and proposals have developed since then.

      Stage 2 Consultation Strategy

      This sets out how we are consulting.

          Draft Environmental Statement

          This document contains a preliminary assessment of the likely significant environmental effects based on the initial information available. It also sets out how we propose to reduce these effects.

          We will continue to update this and present a full Environmental Statement with our DCO application. 

          Name