Wanlass Beck 400 kV Substation
(Formerly referred to as Creyke Beck 400 kV Extension)
Project Description
We need to extend the existing Creyke Beck Substation to the southwest to connect new sources of home-grown electricity. Previously we referred to this as Creyke Beck Substation extension. It is now called Wanlass Beck Substation.
Our planning application was granted permission from East Riding Council on December 2025 (reference 24/03819/STPLF).
Figure 1 below provides an illustration of the proposed layout and design.
To reconfigure the overhead line between Creyke Beck and the new Wanlass Beck substation, we will install an additional pylon beside Wanlass Beck. The pylon will be about 55 m tall. Once it is in service, we can remove one existing, similar height pylon near Creyke Beck substation.
If your enquiry relates to the CPO process, please contact Dalcour Maclaren using the contact details below:
Telephone: 0333 188 5374
Postal: Land Assembly Team, Dalcour Maclaren, 1 Staplehurst Farm, Weston on the Green, Oxfordshire, OX25 3QU
If you have a more general query regarding the project, contact us using the details below:
Email: [email protected]
Telephone: 08083 040658 (lines are open Monday to Friday 9:00am to 5:30pm)
Postal: Freepost CREYKE BECK SUBSTATION (please write this in capitals, no stamp or further address details are required)