Skip to main navigation
Group PLC
NG in the UK
NG in the US
Group
Electricity Transmission
Who we are
Stories
Careers
Media
Contact us
Search
Back
Connections
Back
Home
Connections
Connections process reform
Regional updates
How much will it cost?
How long will it take?
ConnectNow
Grid connections enquiries
Connections process FAQs
Engineering Solutions
Back
Home
Engineering Solutions
About us
Consultancy and bespoke services
Asset Maintenance
Back
Engineering Solutions
Asset Maintenance
High Voltage Services
Oil Management
Overhead Line Condition Monitoring
SF6 Surveys and Top-up
Consultancy and Policy Support
Back
Engineering Solutions
Consultancy and Policy Support
EMF Management
Noise Management
Flood and Natural Hazards Risk Management
Harmonics Consulting Services
Build, Refurbish, Replace, Decommission
Operational Control
Additional solutions
Training
Contact us
Case studies
Back
Engineering Solutions
Case studies
24 hour call out proves essential
An innovative noise solution
Helping EDF Sizewell remain compliant
OMU takes to the road
Incident Response
Back
Engineering Solutions
Incident Response
Spares & Cable Membership
Deeside Centre for Innovation
Network and infrastructure
Back
Home
Network and infrastructure
Infrastructure projects
Back
Network and infrastructure
Infrastructure projects
East Coast Digital Hub - What If
Network route maps
Working near our assets
Planning and development
Gridline magazine
Electricity emergencies and safety advice
Electricity Safety Rules
Visual Impact Provision
Back
Network and infrastructure
Visual Impact Provision
Cotswolds VIP
Dorset VIP
North Wessex Downs VIP
Peak District VIP
Snowdonia VIP
Stakeholder Advisory Group
Landscape Enhancement Initiative (LEI)
Innovation
Back
Home
Innovation
Deeside Centre for Innovation
Project RICA
How to work with us
Environment and net zero
Back
Home
Environment and net zero
Preparing for a net zero future
Our Whole System Approach
Caring for the natural environment
Who we are
Back
Home
Who we are
Running the network
Our network in numbers
Your bill explained
How we're regulated
Our people
Our leadership team
Our RIIO-2 business plan
Our RIIO-T2 performance
Contact us
Back
Home
Contact us
What to do in a power cut
Who is my distribution network operator?
Document library
Breadcrumb
Home
Network and infrastructure
Visual Impact Provision
Documents
Documents
Here is a selection of downloadable documents about the Eryri VIP project.
Name
VIP Fourth Annual Report
VIP Fifth Annual Report
VIP Sixth Annual Report
VIP Seventh Annual Report
VIP Technical Report
VIP Policy Review 2017
VIP Policy 2018
VIP Options Appraisal Study
Compulsory Purchase Order documents
Compulsory Purchase Order documents
Name
Sort descending
How we intend to reduce the visual impact of existing electricity transmission lines in National Parks
NGET (Snowdonia VIP) CPO 2020 - Confirmed 21.10.21 - Pages 1 to 42 Intro and Table 1
NGET (Snowdonia VIP) CPO 2020 - Confirmed 21.10.21 - Pages 126 to 166 Table 1 continue
NGET (Snowdonia VIP) CPO 2020 - Confirmed 21.10.21 - Pages 167 to 210 Table 1 continue and Table 2
NGET (Snowdonia VIP) CPO 2020 - Confirmed 21.10.21 - Pages 211 to 270 Table 2 continue
NGET (Snowdonia VIP) CPO 2020 - Confirmed 21.10.21 - Pages 271 to 330 Table 2 continue
NGET (Snowdonia VIP) CPO 2020 - Confirmed 21.10.21 - Pages 331 to 399 Table 2 continue
NGET (Snowdonia VIP) CPO 2020 - Confirmed 21.10.21 - Pages 400 to 469 Table 2 continue
NGET (Snowdonia VIP) CPO 2020 - Confirmed 21.10.21 - Pages 43 to 85 Table 1 continue
NGET (Snowdonia VIP) CPO 2020 - Confirmed 21.10.21 - Pages 470 to 529 Table 2 continue
NGET (Snowdonia VIP) CPO 2020 - Confirmed 21.10.21 - Pages 530 to 599 Table 2 continue
NGET (Snowdonia VIP) CPO 2020 - Confirmed 21.10.21 - Pages 600 to 655 Table 2 continue
NGET (Snowdonia VIP) CPO 2020 - Confirmed 21.10.21 - Pages 656 to 699 Table 2 continue
NGET (Snowdonia VIP) CPO 2020 - Confirmed 21.10.21 - Pages 700 to 721 Table 2 continue
NGET (Snowdonia VIP) CPO 2020 - Confirmed 21.10.21 - Pages 86 to 125 Table 1 continue
Snowdonia VIP - Order and Schedule - June 2020
Snowdonia VIP - Statement of Reasons - June 2020
Snowdonia VIP Compulsory Purchase Order 2020 - Order Maps - June 2020
Snowdonia VIP Compulsory Purchase Order 2020 - Order Maps - October 2021
Snowdonia VIP FAQs
Latest technical drawings
Latest technical drawings
Sorry, no documents found.
Planning application
Key documents
Environmental Appraisal Volume 1 – main text
Environmental Appraisal Volume 2 – technical appendices
Environmental Appraisal Volume 3 – figures
Key documents
Name
Sort descending
Abbreviations-and-Glossary
Additional Planning Application Drawings - Non Material Amendment application Gwynedd Council 2022
Canllaw i'r Cais
Crynodeb-Amgylcheddol-Cymraeg
Design-Access-Statement
Environmental-Summary-English
Guide-to-Application-English
PAC-Report
Planning-Application-Drawings
Welsh-Language-Statement
Environmental Appraisal Volume 1 – main text
Name
Sort descending
Chapter-1 Introduction
Chapter-10 Ground Conditions
Chapter-11 Agriculture and Land Use
Chapter-12 Transport
Chapter-13 Socio-economics and Tourism
Chapter-14 Noise and Vibration
Chapter-15 Marine Physical Processes
Chapter-16 Marine Ecology
Chapter-17 Marine Ecology
Chapter-18 Cumulative
Chapter-19 Health in Impact Signposting
Chapter-2 Project Description
Chapter-3 Env Appraisal Process
Chapter-4 Consultation
Chapter-5 Planning Policy
Chapter-6 Landscape & Visual Appraisal
Chapter-7 Ecology
Chapter-8 Arch and Cult Heritage
Chapter-9 Water Resources
Environmental Appraisal Volume 2 – technical appendices
Name
Sort descending
Appendix-10A-Relevant-Legislation-and-Policy
Appendix-10B-Historic-map-review
Appendix-12A-Collision-Data
Appendix-14.A-Baseline-Noise-Data
Appendix-14.B-Construction-Plant
Appendix-14.C-Mitigation-Options
Appendix-14.D-Noise-Vibration
Appendix-16A-Marine-HRA
Appendix-17A-Mar-arch-DBA
Appendix-17B-Mar-arch-geophys-review
Appendix-1A-Options-Appraisal
Appendix-2A-CEMP-Part-1
Appendix-2A-CEMP-Part-2
Appendix-2A-CEMP-Part-3
Appendix-2B-Report-on-EMF
Appendix-3A-Screening-Opinion
Appendix-3B-Scoping-Responses
Appendix-3C-Embedded-Mitigation
Appendix-6.A-LVIA-Methodology
Appendix-6.B-Landscape-Character
Pagination
Current page
1
Page
2
Next page
Last page
Last
Environmental Appraisal Volume 3 – figures
Name
Sort descending
Figure-1.1-Overview
Figure-1.2-Consenting
Figure-10.1-Area-of-Search
Figure-10.2-Superficial-Geology
Figure-10.3-Bedrock-Geology
Figure-10.4-Contamination
Figure-10.5-Sensitive-Receptors
Figure-11.1-Snowdonia-Soilscapes
Figure-11.2-Pred-Agri-Land-Classification
Figure-12.1-Highway-Link-References
Figure-12.2-Construction-Traffic-Routes
Figure-12.3-Access-Locations
Figure-12.4-Traffic-Survey-Locations
Figure-12.5-Public-Rights-of-Way
Figure-12.6-Cycle-Routes
Figure-12.7-Garth-Visibility-Splays
Figure-12.8-Cilfor-Visibility-Splays
Figure-13.1-Study-Area
Figure-13.2-Tourism-Hubs
Figure-13.3-Recreational-Activities
Pagination
Current page
1
Page
2
Page
3
Page
4
Next page
Last page
Last