Multi-unit dwelling programs


Important: Final year of the current program and key dates

  • The current Multi-unit dwelling program is nearing the end of its available budget. Application approval is subject to available funding and key dates below. Submission does not guarantee funding.
  • Key dates:
    • November 6, 2026: After this date, we will no longer be able to review Level 2 or DCFC projects with more than 200 kW of added connected load, as there will not be sufficient time to complete the required capacity review.
    • December 4, 2026: This is the final planned date for issuing pre-approval letters, allowing sufficient time for pre-approval letters and supporting documents to be signed and returned prior to December 31, 2026.
    • December 31, 2026: Signed pre-approval letters must be returned by this date to be eligible for current program incentives. Projects may be completed and activated after this date, as specified in the pre-approval letter.
       
  • National Grid has proposed a Phase IV electric vehicle program for 2027 through 2030 (D.P.U. 25-189). Program offerings, eligibility requirements, incentive levels, and timing will be confirmed following a Department order.

For questions, please contact [email protected].

Partner with us to install EV charging stations as an amenity for your tenants at little or no cost.

Multi-unit dwelling (MUD) EV charging program 

This program helps property owners and developers install EV charging stations at properties with 5 or more units by providing up to 100% funding of the electrical infrastructure costs and additional rebates on charging station equipment costs.  (For 20+ unit properties, consider participating in the complimentary MUD EV-ready site plan.)

Step 1. Learn about the Program by reading the Program brochure and reviewing the detailed incentive charts.

Step 2. Select qualified equipment for your project. Please see the following guidance for choosing qualified equipment.

Step 3. Check the Environmental justice community eligibility map to see if your project qualifies for additional funding.

Step 4. For more information on what additional funding sources are available, review the Additional resources section.

Step 5. Review Application requirements.*

Step 6. Have questions before you get started? Contact us and we can answer your questions or connect with one of our EV charging station installers, who can walk you through the application process and discuss your EV project construction.

View the incentive charts

* Incentives are subject to approval please do not purchase equipment or begin construction prior to approval.

TO BEGIN: APPLY NOW

Contact us at [email protected].

 

MUD EV-ready site plans:

Supports property owners of MUDs with 20+ residential units in developing an EV-Ready Site Plan for the infrastructure, EV charging station equipment, and management practices required to provide EV charging to residents.

Plans to include:

  • Proposed project sizing

  • Cost estimates

  • Evaluations of existing electrical infrastructure

  • Operational and financial impacts of the installation

  • Discussion of EV Load Management Systems if needed due to capacity constraints

Up to 100% of the cost of the report will be funded by this offering.

 

Multi-unit dwelling frequently asked questions

For questions and information applying to all EV charging station programs visit our general FAQ webpage.

    For the Multi-Unit Dwelling (MUD) EV Charging Program, National Grid defines a MUD as a Residential building or group of buildings which utilize a shared parking lot and/or garage where EV chargers will be wired behind a shared utility meter(s). Properties not designed for long term residences such as hotels, dormitories, barracks, and shelters are ineligible for the MUD EV Charging Program, but potentially eligible for the Public and Workplace EV Charging Program.

    To participate in this program, the property must have 5 or more residential units. Properties with 1 to 4 unit(s) should consider the Residential EV Charging Infrastructure Program. There is no maximum size for a project in the MUD EV Charging Program.

    No. Since the EV Chargers will be wired to individual residential accounts held by the individual tenants, this project is not eligible under the MUD EV Charging Program. However, each installation may be eligible to participate in the Residential EV Charging Infrastructure Program.

    No. Level 1 ports are not eligible for infrastructure incentives or EVSE rebates in the MUD EV Charging Program.

    Yes. DCFC ports are eligible for the MUD EV Charging Program, however they are incentivized at the Level 2 port incentive levels.

    No, EVSEs at MUD are not required to be networked. If the customer chooses to provide the EV Chargers with networking, the customer could be eligible for the networking stipend.

    The program utilizes the state EJC map for its incentive tier levels for EJC’s, however for specific cases, please contact [email protected].

     

    More general FAQs

    If your question is not answered here, feel free to reach out to our EV Team at [email protected].

    Commercial and fleet program brochure

    Image
    ev-workplace_590x290

    Multi-unit EV charging program overview

    EV-ready requirements for multifamily dwellings

    Image
    ev-charging-station-590x290

    Understand Massachusetts EV-ready parking requirements for multifamily dwellings, including Stretch and Specialized Energy Code updates and flexibility for projects that choose to deploy Automatic Load Management Systems (ALMS).