Installation of new mains and service pipework at Stanley Way generation plant
National Grid Metering Siteworks worked closely with the site operator and developer to provide the gas supply connection with capacity to energise the 13 engines to provide 20MW of electricity to inject into the North West grid network when needed to meet demand from industry and residential customers.
The GIRS design, identification, capacity check and approval of the connection to the mains and the subsequent pressure reduction station and meter commissioning was project managed and delivered by the Siteworks team.