Between now and 2026 we’ll be working with our main contractor Balfour Beatty to install the underground cables and transform the skyline around Devizes by replacing 4.6km of overhead line and 13 pylons to the north of Devizes with underground cables. It’s a significant engineering challenge, but we will seek to minimise disruption wherever possible.
Archaeological surveys
Before we begin the main construction work on the project, there are a number of surveys and preparatory work we need to undertake.