GC0104 EU Connection Codes GB Implementation – Demand Connection Code

Modification status: Current

Last updated: 23 February 2018

This modification will set out within the Grid Code the following compliance obligations in the European Network Code – Demand Connection Code (DCC):

  1. Technical requirements for new* Transmission-connected Demand Facilities; Transmission-connected Distribution Facilities and Distribution Systems.
  2. Technical requirements for Demand Units used by a Demand Facility or a Closed Distribution System to provide Demand Response Services to System Operators.

* ‘New’ is defined as not being connected to the system at the time that the code enters into force and not having concluded a final and binding contract for the purchase of main plant items by two years after entry into force