We are looking for feedback about our new website.

EU Connection Codes GB Implementation – Mod 3

Modification status: Current

Last updated: 6 February 2018

This modification (3/4) will set out within the Grid Code the following compliance obligations in the EU Connection Codes:

  1. Set the System Management parameters, as set out in RfG and HVDC
  2. Set the Compliance requirements, as set out in RfG, DCC and HVDC

Documents