Super SEL

Super SEL is utilised to directly decrease the sum of the minimum MW level (SEL) of generators synchronized to the system by lowering the minimum generating level at a generator synchronised.

Super SEL providers must:

  • Deliver a minimum of 10MW of Footroom
  • A maximum notice period of 12 hours before SEL reduction

Please see the interactive guidance document for further details.