Our digital ambition places our customers at the heart of everything we do, and we recently launched a new suite of tools to help research and manage connections to the Electricity Transmission system in England and Wales.
Try our research functionality which combines the previous Network Capacity Map and introduces more accurate costing tools all in one package. You can also use the new tool to enquire about potential new connections:
Our Research Assistant is an innovative tool that combines our popular Network Capacity Map and Cost Estimator tools into a single, intuitive application.
Use it to investigate capacity, connection options available to you and see estimated cost profiles and associated securities. You can also enquire directly to National Grid Electricity Transmission through the portal for your chosen connection location.
Our customer portal has been designed to enable you to track your connection projects, from initial application right through to being connected to us.
Within the portal:
We are continuing to 'onboard' customers. If you haven't yet signed up to the customer portal, please let us know by emailing [email protected]
Here are some answers to ConnectNow queries we have:
ID | Name | Demand Headroom | Generation Headroom | Fault Level Headroom | Number of Tertiaries Available |
---|
Substation Name:
Substation Type:
Voltage Level:
Substation Technology:
Indoor/Outdoor:
Spare Bays:
Spare Tertiaries:
Demand Capacity: MW
Peak Demand: MW
Demand Headroom: MW
Demand Potential:
Generation Capacity: MW
Connected Generation: MW
Contracted Generation: MW
Generation Headroom: MW
For any queries over 1,000 MW, please contact us via the Enquire button below.
Generation Potential:
Fault Level 3Ph Rating: kA
Fault Level 3Ph Fault Level: kA
Fault Level 1Ph Rating: kA
Fault Level 1Ph Fault Level: kA
Fault Level Headroom: kA
Fault Level Limitation:
Climate average data provided by the Met Office from the period of 1981-2010.
Point of Connection Cost: £k
Average Reinforcement Cost:
Indicative Timescale:
Technology Availability: