About Yorkshire GREEN

We need to build approximately 7km of new overhead lines, some underground cables and two substations, to link up two existing overhead lines (see the blue shaded area on the map at Figure 1), and to reinforce the system to increase the capacity of the network in this area. 

Have your say

We will also upgrade existing overhead lines, by adding a second set of wires on each side so they can carry more electricity where required, and replace fittings and some pylons where necessary. 

The new substations are needed to increase and decrease the electricity voltage in the transmission network. We will also need to build four cable sealing end compounds (where underground cables meet overhead lines), with some additional equipment required at existing substations. 

We have developed our proposals carefully, and we are carrying out an initial public consultation to find out what local people and our statutory stakeholders think.

We will take account of feedback received as we develop detailed plans, which will then be subject to further, statutory consultation before we submit an application to the Planning Inspectorate in winter 2022/23. Subject to approval of our plans, we plan to start construction in 2025 and finish in 2027. 

The following Figures show the geographical extent of the proposed Yorkshire GREEN project, identifying the locations for new infrastructure; a schematic of the existing electricity transmission network in this area; and a schematic showing the proposed new infrastructure alongside the existing network. 

About the proposed infrastructure works

North west of York

Proposals for the North west of York

Tadcaster area

Proposals for the Tadcaster area

Monk Fryston substation area

Proposals for the Monk Fryston substation area

Additional works

Find out more information about additional works

Development and appraisal process

How have we developed our plans?

How have we developed our plans?   

National Grid Electricity System Operator and National Grid Electricity Transmission have undertaken a phased Options Appraisal process to identify our Strategic Proposal for the Yorkshire GREEN project. 

In doing so, we have balanced technical, socio-economic, environmental, programme and cost considerations in accordance with our statutory and licence obligations. 

What is the Options Appraisal process?

Our Options Appraisal is carried out in two parts: a Strategic Options Appraisal and then a more focused Options Appraisal. 

The Strategic Options Appraisal process is a robust and transparent methodology which we use to compare different options for new infrastructure and to assess associated advantages and disadvantages across a range of criteria, including environmental, socio-economic, cost and technical factors. 

We begin by looking at all of the technically feasible options which meet the determined need, which may cover a very wide geographical area and a number of different technologies. We then narrow down the options through a process of careful analysis with engineers, environmental consultants and internal National Grid experts.  

The Strategic Options Appraisal concludes with the preparation of a Strategic Proposal Report, which also takes account of our licence commitments. For the Yorkshire GREEN Project, the Strategic Proposal is for a new section of overhead line to link together two existing overhead lines.   

The next stage of the Options Appraisal is to focus in on broad corridor locations for the new overhead lines, and identified siting areas for specific elements of infrastructure, such as substations. These are assessed by environmental consultants, engineers and other experts to consider and understand the environmental, socio-economic, cost and technical factors.  

We then hold internal workshops on how to minimise known effects, taking account of the technical solutions and environmental implications. The whole Options Appraisal process concludes with a Corridor and Preliminary Routeing and Siting Study Report. In the case of the Yorkshire GREEN Project, this report identifies the preferred corridor for the overhead lines, together with broad siting areas for the associated infrastructure.  

At each stage of the process we gain more detailed information about the constraints and issues that might affect a particular option. As we learn more, we back-check at each stage to see if any new information has come to light which affects any conclusions previously made regarding technology or options. 

Why do we do Options Appraisal?

Options Appraisal provides a framework that allows us to identify and balance technical, socio-economic, environmental and cost considerations in selecting a Strategic Proposal. It also enables us to document, in a transparent way, the information on which we have based our judgements. 

The information we collect as part of Options Appraisal informs our discussions with stakeholders, including the public. Alongside community and stakeholder consultation, Options Appraisal is a key tool in helping us develop and make decisions on projects. All projects are different, and where we need to deviate from this process, we will explain the reasons and ensure that we meet our obligations.