We need to do additional work in some areas as part of the Yorkshire GREEN Project to ensure that the
network can manage the additional energy flows.
These areas are presented as Sections A, C and E within our consultation plans, as shared during our Statutory Consultation in 2021, which provide a detailed overview of the existing infrastructure that will be improved or replaced in these areas. Each section has been split into sheets (or maps) with 17 sheets in total across these geographical areas.
View an interactive map of our proposals