This page sets out our proposals as presented at our statutory consultation between 24 October and 18 December 2023. Although the consultation has now closed, this page has been left online for reference use.
The marine HVDC cables would be routed south from the Suffolk landfall through a section of the Outer Thames Estuary Special Protection Area and to the west of the existing Greater Gabbard and Galloper offshore wind farms. They would head east through the Sunk Traffic Separation Scheme, turning south to route around Margate and Long Sands Special Areas of Conservation and between a number of mineral aggregate sites. The marine HVDC cables would then continue south to the east of the London Array offshore wind farm and west of the Thanet offshore wind farm before turning west to make landfall in Pegwell Bay.
The subsea cable and associated infrastructure would be installed along our proposed marine corridor, with the exact alignment of the cables informed by further marine surveys and statutory consultation feedback. Our corridors have been developed through consultation with marine stakeholders and technical and ecological surveys.
Other factors that have influenced the marine corridor include:
You can read about our marine proposals in more detail in Chapter 12 of our interactive project overview document
View an interactive map of our proposals
Find answers to our most asked questions