Connections document library

All archived documents can be accessed here.

A20 guides

These documents include useful materials and guidance documents. For the application form please visit How to apply.

Standard conditions of contract

Standard Conditions of Contract for the Design and Build of National Grid Facilities.

2018 Informal Consultation

National Grid informal consultation on licence modification to allow change to new points process.

New NTS Entry/Exit points

A new NTS Entry/Exit point is required to be created if there is not already a point listed for the connection in accordance with National Grid's Gas Transporter Licence. This section provides information on this process.

Performance reports

Our regulator Ofgem requires us to publish a quarterly report on how effective we are in delivering connection offers.