Skip to main navigation
Group PLC
NG in the UK
NG in the US
Group
Electricity Transmission
Who we are
Stories
Careers
Media
Contact us
Search
Back
Who we are
Back
Home
Who we are
Running the network
Our network in numbers
Your bill explained
How we're regulated
Our people
Our leadership team
Our RIIO-2 business plan
Our RIIO-T2 performance
Our environmental plan and performance
Connections
Back
Home
Connections
Recent connections to our network
Connections Reform- the future of connections
How we work in Connections
Research Assistant
Engineering Solutions
Back
Home
Engineering Solutions
Additional solutions
Asset Maintenance
Case studies
Consultancy and Policy Support
Deeside Centre for Innovation
Incident Response
Contact us
Network and infrastructure
Back
Home
Network and infrastructure
Infrastructure projects
Back
Network and infrastructure
Infrastructure projects
East Coast Digital Hub - What If
Network route maps
Working near our assets
Landowners, occupiers, and grantors
Planning and development
Gridline magazine
Electricity emergencies and safety advice
Electricity Safety Rules
Visual Impact Provision
Back
Network and infrastructure
Visual Impact Provision
Cotswolds VIP
Dorset VIP
North Wessex Downs VIP
Peak District VIP
Eryri VIP
Stakeholder Advisory Group
Landscape Enhancement Initiative (LEI)
Innovation
Back
Home
Innovation
Deeside Centre for Innovation
Project RICA
How to work with us
Our future network
Back
Home
Our future network
Future Network Blueprints
Our Whole System Approach
Contact us
Back
Home
Contact us
Frequently asked questions
What to do in a power cut
Who is my distribution network operator?
Eryri Visual Impact Provision: document library
Breadcrumb
Home
Network and infrastructure
Visual Impact Provision
Documents
Documents
Here is a selection of downloadable documents about the Eryri VIP project.
Name
Sort ascending
VIP Technical Report
VIP Sixth Annual Report
VIP Seventh Annual Report
VIP Policy Review 2017
VIP Policy 2018
VIP Options Appraisal Study
VIP Fourth Annual Report
VIP Fifth Annual Report
Compulsory Purchase Order documents
Compulsory Purchase Order documents
Name
Sort ascending
Snowdonia VIP FAQs
Snowdonia VIP Compulsory Purchase Order 2020 - Order Maps - October 2021
Snowdonia VIP Compulsory Purchase Order 2020 - Order Maps - June 2020
Snowdonia VIP - Statement of Reasons - June 2020
Snowdonia VIP - Order and Schedule - June 2020
NGET (Snowdonia VIP) CPO 2020 - Confirmed 21.10.21 - Pages 86 to 125 Table 1 continue
NGET (Snowdonia VIP) CPO 2020 - Confirmed 21.10.21 - Pages 700 to 721 Table 2 continue
NGET (Snowdonia VIP) CPO 2020 - Confirmed 21.10.21 - Pages 656 to 699 Table 2 continue
NGET (Snowdonia VIP) CPO 2020 - Confirmed 21.10.21 - Pages 600 to 655 Table 2 continue
NGET (Snowdonia VIP) CPO 2020 - Confirmed 21.10.21 - Pages 530 to 599 Table 2 continue
NGET (Snowdonia VIP) CPO 2020 - Confirmed 21.10.21 - Pages 470 to 529 Table 2 continue
NGET (Snowdonia VIP) CPO 2020 - Confirmed 21.10.21 - Pages 43 to 85 Table 1 continue
NGET (Snowdonia VIP) CPO 2020 - Confirmed 21.10.21 - Pages 400 to 469 Table 2 continue
NGET (Snowdonia VIP) CPO 2020 - Confirmed 21.10.21 - Pages 331 to 399 Table 2 continue
NGET (Snowdonia VIP) CPO 2020 - Confirmed 21.10.21 - Pages 271 to 330 Table 2 continue
NGET (Snowdonia VIP) CPO 2020 - Confirmed 21.10.21 - Pages 211 to 270 Table 2 continue
NGET (Snowdonia VIP) CPO 2020 - Confirmed 21.10.21 - Pages 167 to 210 Table 1 continue and Table 2
NGET (Snowdonia VIP) CPO 2020 - Confirmed 21.10.21 - Pages 126 to 166 Table 1 continue
NGET (Snowdonia VIP) CPO 2020 - Confirmed 21.10.21 - Pages 1 to 42 Intro and Table 1
How we intend to reduce the visual impact of existing electricity transmission lines in National Parks
Latest technical drawings
Latest technical drawings
Sorry, no documents found.
Planning application
Key documents
Environmental Appraisal Volume 1 – main text
Environmental Appraisal Volume 2 – technical appendices
Environmental Appraisal Volume 3 – figures
Key documents
Name
Sort ascending
Welsh-Language-Statement
Planning-Application-Drawings
PAC-Report
Guide-to-Application-English
Environmental-Summary-English
Design-Access-Statement
Crynodeb-Amgylcheddol-Cymraeg
Canllaw i'r Cais
Additional Planning Application Drawings - Non Material Amendment application Gwynedd Council 2022
Abbreviations-and-Glossary
Environmental Appraisal Volume 1 – main text
Name
Sort ascending
Chapter-9 Water Resources
Chapter-8 Arch and Cult Heritage
Chapter-7 Ecology
Chapter-6 Landscape & Visual Appraisal
Chapter-5 Planning Policy
Chapter-4 Consultation
Chapter-3 Env Appraisal Process
Chapter-2 Project Description
Chapter-19 Health in Impact Signposting
Chapter-18 Cumulative
Chapter-17 Marine Ecology
Chapter-16 Marine Ecology
Chapter-15 Marine Physical Processes
Chapter-14 Noise and Vibration
Chapter-13 Socio-economics and Tourism
Chapter-12 Transport
Chapter-11 Agriculture and Land Use
Chapter-10 Ground Conditions
Chapter-1 Introduction
Environmental Appraisal Volume 2 – technical appendices
Name
Sort ascending
Appendix-9B-SuDS-Strategy
Appendix-9A-Flood-Consequences-Assessment
Appendix-8B-Watching-Brief-GI-Results
Appendix-8A-Gazetteer
Appendix-7C-HRA-and-AA-Report
Appendix-7B-Snowdonia-Animal-Report
Appendix-7A-Botanical-Report
Appendix-6E-Photomontages
Appendix-6D-Aboricultural-Report
Appendix-6C-Viewpoint-Appraisal
Appendix-6.B-Landscape-Character
Appendix-6.A-LVIA-Methodology
Appendix-3C-Embedded-Mitigation
Appendix-3B-Scoping-Responses
Appendix-3A-Screening-Opinion
Appendix-2B-Report-on-EMF
Appendix-2A-CEMP-Part-3
Appendix-2A-CEMP-Part-2
Appendix-2A-CEMP-Part-1
Appendix-1A-Options-Appraisal
Pagination
Current page
1
Page
2
Next page
Last page
Last
Environmental Appraisal Volume 3 – figures
Name
Sort ascending
Figure-9.3-Surface-Water-Abstractions
Figure-9.2-WFD-River-Transitional-Coastal
Figure-9.1-Surface-Water-Features
Figure-8.3-Historic-Landscape
Figure-8.2-Des-Heritage-Constraints
Figure-8.2-Des-Heritage-Constraints
Figure-8.1-Heritage-Constraints
Figure-7.2-Phase1-Habitat-Survey
Figure-7.1-Designated-Sites
Figure-6.9-Settlements-and-Infrastructure
Figure-6.8-Tree-Cover
Figure-6.7-Landform-and-Drainage-S2
Figure-6.7-Landform-and-Drainage-S1
Figure-6.6-ZTV-of-Existing-Pylons-to-be-Removed
Figure-6.5-Comparative-ZTV
Figure-6.4-ZTV-of-Eastern-THH
Figure-6.3-ZTV-of-Western-THH
Figure-6.2-ZTV-Above-Ground
Figure-6.13-Viewpoints
Figure-6.12-Seascape-Character
Pagination
Current page
1
Page
2
Page
3
Page
4
Next page
Last page
Last