Transportation System Operations information is available on the following days. The information contained in the reports is D+1 data and is made available as an information service only. National Grid does not assume responsibility for the accuracy of, or the content of the information.
We will endeavour to publish the information on this page on a daily basis by 18.00 hrs. A message will be posted to the Important Messages section advising if this will not be achieved.
| Weather | ||||
|---|---|---|---|---|
| 19/11/2009 | SNT | 7.2 oC | Actual | 13.4 oC |
| 20/11/2009 | SNT | 7.1 oC | Forecast | 9.9 oC |
| 21/11/2009 | SNT | 7.0 oC | Forecast | 11.4 oC |
| Demand | |||
|---|---|---|---|
| 19/11/2009 | Actual Demand | 279.39 mcm | 51.2% peak day |
| 20/11/2009 | Forecast Demand | 282.17 mcm | 51.7% peak day |
| 21/11/2009 | Forecast Demand | 282.43 mcm | 51.8% peak day |
| Supply |
|---|
| The demand throughput was met by a combination of beach and storage gas. |
| System Entry Capacity |
|---|
| For gas day 19th November 09 there was no scale back of interruptible at any entry point. There was no firm capacity buy-back at any entry point. There were 2 Gas Quality TFAs applicable at a Northern entry point. There were no Capacity TFAs applicable at any entry point. |
Glossary
SNT - Seasonal Normal Temperature
mcm - millions of standard cubic metres
peak day - a demand day expected 1 in 20 years
If you require further information about the Daily Summary of Operations page please email john.mcnamara@uk.ngrid.com