National Grid’s High Voltage Electricity Transmission Network Routes

The centre lines of  route corridors for operational High Voltage Overhead Lines are shown in red against a small scale map background. These operate at up to 400 000 volts.

The centre lines of  route corridors for the operational High Voltage Underground Cables are shown in green against a small scale map background. These operate at up to 400 000 volts.

If there is no map background then we do not have such lines and cables in the area.

Please note that overhead lines or underground cables that are under construction or that have been recently constructed or diverted may not be shown.

If, by using the risk table your proposals are rated as High, please contact us in writing with full details (grid references, scaled plans) to the address below:

National Grid Transmission
Land and Development
Asset Protection
PO Box 3484
Warwick
CV34 6TG

If you are in doubt please contact us anyway.

This map does not show other lines and cables operated by electricity distribution organisations who you will need to contact separately. Useful information can be found from the Energy Networks Association at www.energynetworks.org and on the Map