Fixed Storage Charges - 2008/09

Commodity Charges

Facility Storage Injection (p/kWh) Storage Withdrawal (p/kWh)

Avonmouth

0.429

0.030

Dynevor Arms

0.481

0.030

Glenmavis

0.453

0.030

Partington

0.545

0.030

Note: These charges only apply to capacity purchased in the 2008/09 Annual Storage Invitation.

Indicative Capacity Charges (Special Condition C3)

Facility Reserved Space (p/kWh/a) Reserved Deliverability (p/kWh/a)

Avonmouth

1.775

1.283

Dynevor Arms

2.956

1.889

Glenmavis

1.523

1.400

Partington

1.130

1.034

Tanker Filling Charges

Annual Tanker Filling Slot

£3,577 per annum

Storage Withdrawal

£260 per tanker

 

Carry Over Charges for Uncovered Gas in Store

Carry Over Month Charge (p/kWh/day)
May

0.0000

June

0.0002

July

0.0006

August

0.0012

September

0.0048

October

Mandatory Withdrawals Apply

 

Injection Overrun Cap

Overrun Month Charge (p/kWh)
May

0.0000

June

0.0100

July

0.0170

August

0.0100

September

0.0100

October to April

0.0000

 

Permitted Deliverability Overrun Charges

Overrun Month Charge (p/kWh)
June, July, August, September

0.0875

April, May, October, November

0.1825

December, January, February, March

0.3650

 

Withdrawal Standby States and Charges

Site State Lead Time Cost per day

Avonmouth

1

1 hr

n/a

 

2

2 hrs

£1163

 

Normal

6 hrs

£0

Dynevor Arms

1

1 hr

n/a

 

2

2 hrs

£436

 

Normal

6 hrs

£0

Glenmavis

1

1 hr

n/a

 

2

2 hrs

£1066

 

Normal

4 hrs

£0

Partington

1

1 hr

n/a

 

2

2 hrs

£1838

 

Normal

8 hrs

£0

Standby Conditions:

a) system demand is greater than 75% of estimated peak demand, or

b) "bid to buy prices" for the Day are equal to the average summer gas price plus the injection commodity price plus the clearing price for the facility minus 0.1 p/kWh

and at other times at the discretion of LNG Storage

Notes:

State 1: Typically when a site is withdrawing gas

State 2: When a site is at a shortened withdrawal lead-time, but not withdrawing gas

Normal: Where a site is not at a state ready for withdrawing gas

For the avoidance of doubt a User will not be able to requrest that a particular facility be moved to a lead time of 1 hour ("State 1") as a facility will only move to that state when it is already flowing.