Site Capacity

2008/09 LNG Storage Capacity

Injectability (GWh/d) Space (GWh) Deliverability (GWh/d) Duration (days)

Avonmouth

2.4

860.4

156.2

5.5

Dynevor Arms

2.1

277.8

49.2

5.6

Glenmavis

2.6

544.4

101.1

5.4

Partington

3.3

1,146.1

219.8

5.2

Total

10.4

2,828.8

526.3