SISR04 - Actual Demands

This report shows the Actual Commercial Demands (in MCM) for each of the LDZ's (Local Distribution Zones) for a single Gas Day, and also the sum of all LDZ demand. Additionally, the actual throughput (in MCM) for the whole of the NTS for the same Gas Day is also shown (this figure includes all LDZs, Storage Injections, Interconnectors, NTS Linepack Change and NTS direct feed VLDMC demands.