Detailed Route Corridor Study

A Route Corridor Study (RCS) has been undertaken by environmental consultants TEP on behalf of National Grid to identify potential route corridors between an existing substation at Bramford and a tee point on the existing overhead line system in the vicinity of Twinstead. This report summarises the key issues arising from the RCS.

Take a look at the strategic options report to see a detailed examination of what other options were considered.

You can download the detailed report below and give us your feedback via the consultation pages of this web site.

Route Corridor Study Documents

11 June 2011
Ornithological Assessment Report
02 June 2010
Bramford - Twinstead route corridor study map
26 October 2009
Executive Summary
26 October 2009
Route Corridor Study Report
26 October 2009
Figure 1 - Study area
26 October 2009
Figure 2 - Environmental constraints
26 October 2009
Figure 3 - Topography
26 October 2009
Figure 4 - Landscape Character
26 October 2009
Figure 5 - Historic landscape characteristics
26 October 2009
Figure 6 - Environmental Constraints with Route Corridors
26 October 2009
Figure 7 - Potential grid supply points
26 October 2009
Figure 8-15 - Photo sheets
26 October 2009
Figure 16-19 - Zone of visual influence
Zone of Visual Influence
26 October 2009
Appendix
 