Metered half-hourly electricity demands

National Grid metered half hourly electricity demands including pump storage demand and generation, Moyle interconnector flows and French interconnector follows. Including a list of generators metered to make up the total demand.

The half hourly demands are given in the following formats:
1. INDO – Published BMRA Initial Demand Outturn based on National Grid operational generation metering. EXCLUDES Station Load, Pump Storage Pumping and Interconnector Exports.  This can be compared against the BMRA 08:45 DF.  The list of Generators is in the BMU_List sheet.
2. E&W - For legacy users this is a continuation of what would be Pre-BETTA INDO.
3. IO14_DEM - This is calculated from Elexon SO_IO14 generation data.  It is the sum of the same generation meters as INDO.  The Station load value has NOT been subtracted (500MW in BST and 600MW in GMT).
4. IO14_TGSD -Total Gross System Demand calculated from Elexon SO_IO14 generation data and INCLUDES Station Load, Pump Storage Pumping and Interconnector Exports.  This can be compared to DF forecasts apart from the 08:45 issue.

Demand Data

Jan - Apr 2012
July - Dec 2011
Jan _ June 2011
Jul - Dec 2010
Jan - June 2010
Jul - Dec 2009
Jan - Jun 2009
Jul - Dec 2008
Jan - Jun 2008
Jul - Dec 2007
Jan - Jun 2007
Jul - Dec 2006
Jan - Jun 2006
Jul - Dec 2005
Jan - Jun 2005
Jul - Dec 2004
Jan - Jun 2004
Jul - Dec 2003
Jan - Jun 2003
Jul - Dec 2002
Jan - Jun 2002
Jul - Dec 2001
Apr - Jun 2001
Energy Data Apr 1971 - Mar 2005
 

Many of the files available to download on this page are Acrobat PDF files. To access these you will need Acrobat Reader which is available from the Adobe web site.