Review Panel Info – 2011 Meetings
The Grid Code Review Panel is a standing body established and maintained by National Grid in accordance with the General Conditions of the Grid Code. It comprises members from across the industry who have an interest in the development of the Code. Its main purpose is to keep the Grid Code and its working under review, and to discuss possible changes to the Grid Code in advance of the publication of proposals for change by way of a formal consultation paper.
17 February
Presentation - European Network Codes
Presentation - Operational Update
Presentation - Frequency Response and Technical Sub Group
Presentation - Grid Code Signatories Consultation
Presentation - Black Start
pp11/19 - Grid Code Signatories Consultation
pp11/18 - 2011 GCRP Membership
pp11/17 - G59 Generator Protection Settings (Progress Update)
pp11/16 - Simultaneous Tap Changing
pp11/15 - Special Actions
pp11/13 - Intertripping Offshore (F/08)
pp11/12 - Review of Actions
pp11/09 - Consultation Papers
pp11/08 - Grid Code Requirement for Electronic Communication Facilities between NGET and BM Participants
pp11/07 - Electricity Balancing System Group
pp11/06 - Operational Broadcast System
pp11/05 - Revision of CC7.7 Maintenance Standards (Draft ToRs)
pp11/04 - BMU Configuration of Power Park Modules Offshore (Draft ToRs)
pp11/02 - Demand Control (OC6)
pp11/01 - Governance of GCRP Meetings
31 March
Proposed Working Group Schedule - 2011
Summary of Actions and Status from February 2011
Development Issue Continuous Voltage Control - hybrid system
Two Shifting LimitsA paper by National Grid
19 May
pp11/33 Operational Metering Requirements On Small Requirements On Small Embedded Power Stations Subject To A Bilaternal Embedded Generation Agreement
pp11/32 - Licence Exempt Embedded Medium Power Stations
pp11/27 – Consultation Papers & Development Issues
pp11/31 – Two Shift Limits
pp11/30 – Review of Actions
pp11/26 – Operational Broadcast System
pp11/25 – Grid Code Requirements for Electronic Communication Facilities between NGET and BM Participants
pp11/24 – Voltage Fluctuations
7 July
Presentation - Operational Forum Update
Presentation - Frequency Response Working Group Update
pp11/42 - Two Shifting Limits - A Proposal
pp11/43 - GCRP Briefing Paper – JESG
pp11/41 - Summary of Actions
pp11/39 - Frequency Resilience of the Total System
pp11/38 - Consultation Papers & Amendments
pp11/37 - Joint GCRP/DCRP LEEMPS Working Group Draft Terms of Reference
pp11/36 - Offshore Wind Farms Not Connected to an Offshore Transmission System
pp11/35 - Operational Metering for Embedded Small Power Stations
pp11/34 - Information Required to Evaluate Subsynchrononous Resonance on the Transmission System
22 September
Revised Special Actions (Presentation)
Grid Code Signatories (Presentation)
Frequency Response Working Group Update (Presentation)
Operational Update (Presentation)
Wind Operation (Presentation)
pp11/57 - Revision of CC.7.7 ToR
pp11/56 - Draft Frequency Response ToR
pp11/51 - Voltage Fluctuations
pp11/53 – Summary of Actions
pp11/52 – July 2011 GCRP Minutes
pp11/50 - Consultation Papers & Development Issues
pp11/49 – C/11 - Draft ToR for further WG meeting
pp11/48 – C/11 – BMU Data from Intermittent Generation (Presentation)
pp11/47 – C/11 – Quality of Wind BMU PNs (Presentation)
pp11/45 – LEEMPS Draft ToR
pp11/44 – Operational Metering requirements on Small Embedded Power Stations ToR
pp11/46 Grid Code Signatories Joint Working Group Report
pp11/46A - Grid Code Signatories Joint Working Group Report (Annexes)
17 November
Presentation - Maintenance Standards WG Update
Presentation - OC6 Demand Control
Presentation - Operational Update
Presentation - Frequency Response Technical Sub-group Update
Presentation - Data Validation Consistency and Defaulting Rules
Presentation - C/11 Further Meeting
Presentation - Statutory Instrument
Presentation - ROCOF Report
pp11/58 - OC8 Safety Management of Three Position GIS Earth Switches
pp11/59 - Revision of Data Validation and Consistency Checking Rules
pp11/60 - Housekeeping Modifications
pp11/61 - Generator Build
pp11/61a - Generator Build (Connection Conditions)
pp11/61b - Generator Build (Data Registration Code) *Updated
pp11/61c - Generator Build (Planning Code) *Updated
pp11/62 - Frequency Resilience of the Total System (Terms of Reference)
pp11/63 - Revision of CC.7.7 (Maintenance Standards)
p271 Authority Decision Letter
pp11/64 - Consultation Papers & Development Issues
pp11/65 - Draft September GCRP Minutes
pp11/66 - Summary of Actions
pp11/67 - Multi Unit BMU Update
pp11/69 - 2012 Meeting Dates